Skip to main content

Winter maintenance shutdown at Leominster swimming pool

Due to essential scheduled maintenance, the swimming pool at the Leominster Leisure Centre will be closed from Monday 3 December 2012 until Friday 4 January 2013.

The Pool will re-open at 11am, Saturday 5 January 2013. The fitness suite, sports hall, squash court and studios will remain unaffected by this closure.

Herefordshire Council must ensure that programmed maintenance takes place at regular intervals to prevent unscheduled closures and disruptions to activity that can be open-ended and costly.

All other activities will continue as normal during this period but please check directly with Halo Leisure for specific facility opening times over the Christmas holiday period.

People can ring them on 0300 012 1222 option 3 or via the website http://www.haloleisure.co.uk/ 

We wish to apologise in advance for any inconvenience caused.